Means of Verification
The content of deliverable D4.5 will include the technical details and the pictures of the beam and dosimetry instrumentation that have been installed in the GSI beamline.
Details
| Work Package No. | WP4 |
| Lead Beneficiary | GSI |
| Due Date | 2025-12-31 |
| Status | Achieved |